Pricing

The price depends on the process, not on the number of buttons.

Two companies with the same headcount are rolled out differently: one needs nothing but sales and production, the other needs crews, a warehouse and two legal entities. So we look at the process first and name a figure second.

Preliminary estimate

Example: a workshop with its own installation team

    —rollout, one-off
    —support, per month
    Price up your configuration

    Estimate

    Tick what you need and the figure is calculated instantly.

    The core is always on: nothing else works without it. Beyond that you add only the modules you will actually use.

    A typical set

    A starting point for three typical companies. From there tick and untick whatever you like — the figure recalculates.

    Business lines

    A second legal entity means separate contracts, its own bot and its own reporting, so the configuration work nearly doubles.

    Data migration

    From spreadsheets it is quick. From an old system it takes longer: we reconcile what does not match, and why.

    How many people will work in the system

    12

    The first ten are included in support. Headcount barely affects the configuration — only the training and the support.

    This estimate is preliminary: it shows the order of magnitude and the structure of the price. We name the exact figure after a short conversation — and it usually goes down rather than up, because some modules turn out to be unnecessary.

    What it is made of

    Three parts, priced separately.

    01

    Configuration for your process

    One-off work. We do not just “switch on a box” — we line the system up with the way an order really moves through your company.

    • Deal stages and production stages under your own names
    • Roles and permissions: who sees what and who can change what
    • Reference books: services, materials, consumption rates
    • The numbers the director sees first

    Tick the modules

    02

    Data migration

    It depends on the state the data is in today. The longest part is not the spreadsheets but agreeing on what counts as a client and what counts as an order.

    • Clients and order history from spreadsheets or an old system
    • Open deals and orders in progress
    • Stock levels as of the switch-over day
    • A check: what did not reconcile and why

    Choose the migration

    03

    Support

    Monthly. The first months after launch are the heaviest: people are getting used to it and asking questions.

    • Keeping the system running, and backups
    • Staff questions and follow-up training
    • Small changes as your processes change
    • System updates with a “What’s new” section

    See the monthly figure

    What moves the figure

    What makes a rollout more expensive.

    So you can gauge the order of magnitude before we even talk.

    Number of business lines

    One legal entity and one process is the base case. Two lines with different contracts, bots and reporting is almost two configured systems in one.

    significantly
    Production

    If there are twelve stages and each has its own owners and rates, the configuration takes longer than for a company that resells finished goods.

    significantly
    State of the data

    A tidy spreadsheet migrates in days. Five notebooks, three files and a manager’s memory is a job of its own, and it is fairer to price it separately.

    significantly
    Number of people

    It matters less than you would think: the system is built for a department, not for a single operator. It affects the training, not the configuration.

    moderately
    Exchange with 1C

    A separate stage of the rollout. In the first conversation we agree which reference books and documents move in each direction, and build that into the timeline.

    A separate stage

    How a rollout runs

    Four steps, after which the system is working.

    01 The conversation

    You describe how an order moves today. We show the system on that example and say what we will do.

    02 Settings

    Stages, roles, reference books and metrics. You are looking at your own system, not at a demo.

    03 Migration and training

    The data moves across and people go through the in-system guide for their own role.

    04 Live operation and support

    The first month is the densest: people’s questions, small fixes, checking the first reports.

    The timeline depends on how much data moves. We will name it after the first conversation, and not before.

    The questions people ask first

    Four answers before we talk.

    Two people discussing an order at a table in the workshop
    The first conversation is your order on the table, not our slide deck.
    What does it cost “roughly”?

    The example above and the calculator show the order of magnitude. We name the exact figure after half an hour of conversation: without understanding the process, a number only grows later.

    Can we start with one department?

    Yes, and that is what most do: sales first, then production. Modules are switched on gradually and the data is never migrated twice.

    Is the data ours or yours?

    Yours. CSV export is in the sections, and it is not “an extra charge”.

    What if the process changes?

    Stages, roles and reference books are changed in the settings. Nobody has to rewrite the system for that.

    We will price it on your process.

    If your processes do not fit the ready-made modules — the studio builds an ERP for one specific company.